pert near done...
#1
pert near done...
After almost a year, it is about ready to be started again!
I need to add coolant, check wires, check vacuum lines, check all other connections, get the O2 sensors in place and clean the wiring.
then flash the computer with a new tune, prime the engine, install spark plugs, fire it up, check that the wideband is working, check that the snow kit is working, then drive it around a bit to seat the rings.
I need to add coolant, check wires, check vacuum lines, check all other connections, get the O2 sensors in place and clean the wiring.
then flash the computer with a new tune, prime the engine, install spark plugs, fire it up, check that the wideband is working, check that the snow kit is working, then drive it around a bit to seat the rings.
Thread
Thread Starter
Forum
Replies
Last Post
Stang Kang
Show, Shine, and Tunes!
35
10-23-2009 08:30 PM